EarthX Batteries
Sponsor
- Joined
- Apr 12, 2021
- Messages
- 20
- Reaction score
- 5
Hello and thank you for taking a look at this post. We are working hard here at EarthX to add more aircraft to our AML STC but we are having trouble getting information needed for the PA-16 and the PA-60 aircraft. Our engineers have asked for:
Pics for the battery installation location are a huge help, in particular the battery box and vent or drain tubes from the existing box. We typically run our vent tube out the same drain tube hole in the belly. Also, sometimes the battery cable length is an issue for our terminals would be slightly farther from the edge of the battery and an inch more towards the center of the battery as compared to the existing. Pictures of the battery’s surrounding area are also helpful.
If you are able and willing to help, please reach out to me at [email protected] or call 970.674.8884 ext. 2.
Thank you!!!
Kathy Nicoson
EarthX, Inc.
www.earthxbatteries.com
Pics for the battery installation location are a huge help, in particular the battery box and vent or drain tubes from the existing box. We typically run our vent tube out the same drain tube hole in the belly. Also, sometimes the battery cable length is an issue for our terminals would be slightly farther from the edge of the battery and an inch more towards the center of the battery as compared to the existing. Pictures of the battery’s surrounding area are also helpful.
If you are able and willing to help, please reach out to me at [email protected] or call 970.674.8884 ext. 2.
Thank you!!!
Kathy Nicoson
EarthX, Inc.
www.earthxbatteries.com